Hammersmith Road cycleway to become permanent after council backs TfL’s £20m plan
Cabinet voted unanimously for the C9 scheme, which adds three floating bus stops. A resident had urged councillors to reject it over safety.
A lift and a double-width staircase replace two old stairways that took up half the pavement, paid for by the developer of the office block next door.
King’s Cross St Pancras Tube station now has a step-free entrance on the south side of Euston Road. The new entrance has a lift and sits beside the Belgrove House office development.
It replaces two staircases at the southern end of the subway that runs under Euston Road. Neither staircase had a lift, and together they took up half of the pavement, so the spot was a well-known pinch point for people on foot.
A staircase twice the usual width curves down to a new landing, which joins the existing subway and leads on to the rest of the station. Early plans showed a lift with doors on one side only. The lift that was built has doors on both sides, so passengers walk in one way and out the other instead of backing out.
The chance to rebuild came in 2021, when the office scheme next to the old stairways was asked to leave a cut-out at its corner for a larger staircase and a lift. The developer, Precis Advisory, paid the full cost as part of Belgrove House.
The station already had step-free access, but only from the north side of the road, where the main entrances and the mainline stations are. Anyone starting on the south side had to cross Euston Road or, more often, struggle down the steps.
The extra lift also gives the station a back-up when one of its other lifts is out of action for a fault or maintenance. Both old entrances have now gone. One was removed while the office was being built and the other in recent weeks, and the pavement is now twice as wide.
Seb Dance, the Deputy Mayor for Transport, said the entrance would “make journeys easier for the many customers who use this busy station every day”. Anne Clarke, who sits on the London Assembly for Camden and Barnet, expects it to make “a real difference to disabled passengers, parents with buggies, older people” and anyone who finds inaccessible transport hard to use. She also thanked the King’s Cross councillors Simpson, Martin-Lane and Bautista for pressing to get it built.
On the south side of Euston Road, next to the Belgrove House office development. It connects to the station through the existing subway under the road.
Precis Advisory, the developer of Belgrove House, paid the full cost.
Yes, but only from the north side of Euston Road. Passengers on the south side had to cross the road or use the stairs.
Cabinet voted unanimously for the C9 scheme, which adds three floating bus stops. A resident had urged councillors to reject it over safety.
Track work also closes part of the Weaver line for the weekend and shuts the Hertford East branch for nine days.
Places for London has finished converting 12 arches under the Jubilee and Metropolitan lines and is now looking for businesses to move in.
Two station assistants turned wasteland into a community garden. Public voting runs until Sunday 18 October, and the winner will be named on 20 October.
We use strictly necessary cookies to run the site and to remember this choice. With your permission we would also use analytics cookies, to count visits and see which stories are read, and advertising cookies, so the adverts that pay for How2London can be shown and measured. You can accept all, reject all, or choose for yourself. Read our cookie policy and privacy policy.
Needed for the site to work and to remember your cookie choice. Always on, no consent required.
Google Analytics 4 counts visits and shows which stories are read. Without consent it runs without cookies.
Google AdSense cookies, used to show and measure adverts. Our own How2London banners need no cookies and are shown either way.